I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1.

I'm working on another project - TI - where the entire building is our LEED boundary, however the MEP engineer had limited scope of work. (They did not design air conditioning for the stairwells, for example).

What's the best solution here? Will a narrative justifying a smaller SF be accepted, or should we adjust our SF - thereby lowering our lighting power reduction?