Forum quick links
What are the criteria for Group Certification
posted by Deborah Lucking on
Hello, I refer to Donald Green's comment from April 9 2014, "GBCI really wants all buildings in a Group Certification to be very similar, that way the Group Credits can be documented easily.
LEED NC 2009 Group Certification
NC-2009 PIf1:Minimum Program Requirementsposted by Neumann Monson on
Our project consists of two buildings on a shared site, to be built in two phases.
Clean Linen closets and Dirty Utility rooms in a rehab center
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saju Varghese on
Are linen closets and dirty utility rooms required to have exhaust to meet this credit? I know laundry rooms are
Combined Staff Break Room and Cleaning Materials Storage
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ryan Hoffman on
Our project is the renovation of a space that will be cleaned by an outside contractor.
LEED v4 ND and Existing Buildings
ND-v4 GIBp2:Minimum building energy performanceposted by Philippa Cameron on
LEED ND certification has been requested for a site made up of half existing occupied buildings and half buildings under construction which are nearing completion.
LEED CI - EA p2- Mandatory requirements - compliance forms
CI-2009 EAp2:Minimum Energy Performanceposted by Devanand Ragbir on
Our CI space is bounded by the base building's envelope on 2 sides. We will be adding shades to the windows. Is it a requirement for us to do the envelope compliance forms?
International Projects
posted by Marcus Sheffer on
I was wondering how much of the decision to delay was due to international uptake.
Exemplary performance for SSc2 in LEED v.2
NC-2009 SSc2:Development Density and Community Connectivityposted by Whysal Haddad on
I have a project with a Project Development Density = 298,419 Sf/acre and after the calculations the Average Neighborhood Development Density = 249,458 Sf/acres. I want to pursue the exemplary perf
Defining performance goals and seeking an example initiative
Pilot-Credits EApc59:Occupant engagementposted by Samantha Harrell on
Regarding this requirement: "Track and document the results of the occupant engagement initiative(s) against the established performance goals and identify areas for improvement." Which performance
Is a borrow pit considered "previously developed" land?
ND-v2009 SLLp5:Floodplain avoidanceposted by Jason Franken on
Our project includes a large location that was disturbed and altered for use as a borrow pit during the construction of a nearby interstate highway.