Orientation for existing building energy simulation
NC-2009 EAc1:Optimize Energy Performanceposted by Mark JIN on
Hello, I'm doing a factory project in Bangkok now. A new production building will be built adjacent to an existing production building.
Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
What is acceptable for 10 years historical data-is it necessary to enter daily rainfall for 10 years-or can average monthly for each of the 10 years-enter annual?
Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
when looking at a site to obtain information about natural conditions with an existing school being torn down and a new school being built-how would you access or would it even make sense to evalua
Hotels: separate surveys & corrective measures 4 guests & FTEs?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Susan Di Giulio on
HI, Continuing the Hotel conversation, the 2013 IEQ matrix indicates that guestrooms, front desk and BOH - housekeeping areas should be included for IEQc7.2.
Fast charge
NC-v4 LTc8:Green vehiclesposted by Dionisio Franca on
On LEED 2009, I remember reading that using a charger that could half the charge time would be counted as 2 charge stations. Did this change for LEED v4?
Des Heating
CS-2009 EAp2:Minimum Energy Performanceposted by Lorey Flick on
I have 5 existing buildings on a campus that are served by a common (existing to remain) steam boiler plant. There are no other buildings served by this plant.
Mechanical Insulation
CS-2009 MRc4:Recycled Contentposted by Sarah Gagnon on
I know MEP components are not included in the MR4 credit. What about piping or duct insulation? Insulation is part of Division 7, so I say it should be included.
LEED v4 CI , E&A :AEDG 50% requirements
CI-v4 EAc2:Optimize energy performanceposted by Vinay Shekar on
The tenant space that we are looking to certify for LEED v4 CI is part of an existing building .
Pilot - option 1 - EPD
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Baseline, section 6.4.3.9 and G3.1.1, single zone system
NC-2009 EAp2:Minimum Energy Performanceposted by Sarah Leenknegt on
Dear all, I have an office building with an auditorium, which is served by the same AHU that serves the surrounding office.