Forum quick links
Post construction AND Post Occupancy Flush Out
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Denise Domino on
3.2 IAQ Mgmt. Plan - What are your options if neither Option 1 or 2 were done?
PV covered parking
NC-v4 SSc5:Heat island reductionposted by Deborah Lucking on
We understand that buildings roofs with PV should be excluded from the roof calculations. Does that also mean that PV canopies over on-grade parking should be excluded?
Can I build a career in this industry without a relevant degree?
NC-v4 SSc5:Heat island reductionposted by David Baker on
I live in Southern California and I have a degree in public administration and I took a few graduate classes in public administration as well, but have never worked in that field.
100' Distance on a Campus
NC-v4 LTc6:Bicycle facilitiesposted by Brightworks Sustainability on
Hi all, My project is part of a campus where the owner is building a garage along with our project.
Resinous Flooring
CI-v4 EQc2:Low emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?
Hot Water and Chilled Water Primary- Secondary Pumping
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Engineer on
My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.
EN 13779–2007
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
We are deciding between the use of EN 15251 and the use of ASHRAE 62.1. Do you have experience in applying EN 13779–2007?
Reverberation Time in Very Lage Open Office Areas
NC-v4 EQc9:Acoustic performanceposted by Levan Natadze on
Hello, Cold you please provide a tip, how to achieve reverberation time 0.8 in very large open office areas. Good absorptive materials do mot work for so large spaces as 1,000 sq.
Historic District
NC-v4 LTc3:High priority siteposted by Indochine Engineering VN on
Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?