Forum quick links
Substantial Renovation - Envelope Modeling
Schools-NC-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Hi, I am modeling an existing school building which is undergoing substantial renovation. As a part of the renovations, new windows are being added and the grade level is being changed.
Updated Water Sense Tool Link
NC-v4 WEp1:Outdoor water use reductionposted by Nick Semon on
The location of the EPA's Water Budget Tool has been changed: https://www.epa.gov/watersense/water-budget-tool That's only version I can find for projects that want to use it, but based on some ea
Eco Boost Option
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Brightworks Sustainability on
My project is looking into a Kohler Awaken showerhead that performs at 1.5 gpm with a button to provide a 2.0 gpm "eco boost" when more pressure is needed for rinsing out hair.
car wash by hand (manual car wash) at a car dealership
CI-v4 WEp1:Indoor water use reductionposted by Kristen Magnuson on
Community, I am assuming we are safe to exclude a sink being used for a manual car washing station (hand-wash carwash) at a car dealership.
Envelopment in silos
CS-v4 EAp2:Minimum energy performanceposted by Instra Ingenieros on
Hi!, I have one doubt with this rating system and how it applies to my case. We want to certify a logistic centre, we choose this rating system because the interior fitting and the distribution of
estimated energy use
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Hatice G. on
In Portfoliomanager you can click that your entered energy consumption is estimated. Is it allowed that you have also estimated energy uses to receive EAp2?
LEED Healthcare 2009 - Minimum Energy Performance Calculator
Healthcare-v2009 EAp2:Minimum energy performanceposted by Christie Morris-Withers on
Hello all, I need assistance in finding the subject Minimum Energy Performance Calculator that I am required to complete for Option 1. Whole Building Energy Simulation.
IEQc5 Daylight Measurements
EBOM-v4 EQc5:Daylight and quality viewsposted by Alexa Stone on
Does the daylight measurement need to show compliance at both measurements to achieve the credit? We are making improvements that comply on the 2nd measurement. Please advise and thanks.
Building on existing peer but parking on "reclaimed" land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Eesmyal Santos-Brault on
Our project will include a renovation and expansion of an existing building on an existing peer in the ocean, so it meets MPR 1, but the owner plans to add a new peer to build a parking lot adjacen
Mixed-use C&S building
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Rodrigo Gomez Junco on
Hi, We are pursuing Case 3 Option 1 for a mixed-use building with more than 10% commercial area, and will have to demonstrate that the parking capacity meets but does not exceed minimum local zoni