Forum quick links
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Mélanie Pitre on
Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome
Remediation outside of LEED Project Scope
NC-v4 LTc3:High priority siteposted by Risto Beatty on
Can this credit be achieved if the remediation occurred outside of the LEED project scope? My understanding is that this was not allowed for the Brownfield Redevelopment credit under LEED v3.
Obtaining the credit
CS-2009 SSc2:Development Density and Community Connectivityposted by Paulo Patrício on
Hi. Concerning Sustainable Sites (SS) Credit 2, Developmental Density and Community Connectivity, I have some doubts about the option 1 of this credit.
1-Existing to Remain Parking Space, Reserved for ADA
NC-v4 LTc7:Reduced parking footprintposted by Sara Zoumbaris on
Hello, We have a project that will designate the 1-existing parking space for ADA upon project completion.
Exterior covered spaces
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Aneta Firląg on
We want to use paving block as one of the hardscape surfaces.
Combisteamer water use
Schools-2009 WEc4:Process water use reductionposted by Aneta Firląg on
In our project we have combisteamer, which is boilerless. In installation instruction provided by manufacturer there are 2 different values of water use.
Residential Flush out Requirements
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Rachel Manoguerra on
I've seen two other people ask this question, but can't find that it's been answered. So sorry, if I'm asking an already answered question.
Campus Project
Pilot-Credits PC14:Walkable Streetsposted by Sara Goenner Curlee on
I have a campus project in Wisconsin. University projects are generally walkable and try to continue a very pedestrian orientated feel.
Sherwin Williams Pro-Cryl Universal Primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Under what category should I assign the Sherwin Williams Pro Industrial Pro-Cryl Universal Primer? This is an acrylic primer.
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.