Pilot-Credits IPpc96:LEED Labposted by David Dominguez on
We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab.
Cx plan
NC-v4 EAp1:Fundamental commissioning and verificationposted by Joshua Roy on
Does anyone have an example Cx plan?
randomly selected employees
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Hatice G. on
Hi, our building s located in Germany. We choosed Option 3 Approach 2. We ordered a company to do the survey.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Use of C&S Commissioning documentation
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Izabela Kwiecinska on
Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.
Floor Coatings Compliance with IEQc4.3 in LEED 2009
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mario S. on
We have a concrete floor, and we plan on putting a coating on top of the concrete finish.
Humidifier / Economizer / Energy Recovery
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hi, I would like to ask 3 simple questions: 1) if a humidifier in proposed AHU is presented, can it be considered as a process load and thus modeled in baseline?
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and Verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Prefinished wood flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brianna Brandsen on
when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site