CI-v4 EAc2:Optimize energy performanceposted by Casey Krieg on
This question is in regards to the Optimize Energy Performance section, under the Prescriptive compliance method and more specifically the Equipment and Appliances credits. My team and I are seeki
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
Additional Credit Rules
EBOM-v4 LTc1:Alternative transportationposted by Logan Cohen on
Is it important to know the entire calculation for the O+M Exam? Also, I'm reading the other comments and finding that there are rules about this credit not listed on this site.
tested flush and flow rates
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Erin Holdenried on
I have a major renovation project that has existing plumbing fixtures that will remain.
Indoor Water Use Reduction Credit Threshold - 7 pt?
CI-v4 RPc1:Regional priorityposted by Aaron Dahlstrom on
I am considering pursuing the RP point available in Philadelphia, PA for Indoor Water Use Reduction.
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Baseline HVAC System Type - for laboratories
NC-v4 EAp2:Minimum energy performanceposted by Carol SR on
Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a
Published data on Base Building in leiu of CBECS
CI-v4 EAc6:Green power and carbon offsetsposted by Aaron Dahlstrom on
The credit requirements ask tenants to scale their carbon offsets / REC purchases based on CBECS data, if a tenant energy model is not available.
Apartment flush-out
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Henderson on
I'm not an engineer or designer, but I have a question related to a new apartment I just moved in to. The building is new construction, and only the 4th floor (top floor) is completed.
Uses in project boundary?
ND-Plan-v4 NPDc3:Mixed-use neighborhoodsposted by Sarah Kearney on
Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary