posted by Catharina B on
Hi All My project is after precertification, there all Pif's are approved. Now during the construction the quontity of regularly area has been changed.
Lighting power density in tenants
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
According to LEEDv4 reference guide, tenants' lighting system must be modeled identically in the proposed building and in the baseline, as specified by Appendix G (unless energy savings are being c
Storm water calculation
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Diverse uses located within LEED project boundary
NC-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Amount of rainwater treated with a storage tank
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi all, I'm working on a project that is pursuing LEED certification.
self-levelling compound
Retail-NC-v2009 IEQc4:Low-emitting materialsposted by stefano pieretti on
Does anyone know which categories of low emitting materials is the self-leveling compound ?
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
New Equipment with or without 0.5lb of Refrigerant
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Rosenberger on
I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units.