Forum quick links
noise and emissions controls
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by cathy keagle on
Our reviewer has asked for noise control levels to be set by a maximum db level. Does anyone know if there is a specific limit for this?
Solar PV Array Ownership
NC-v4 EAc5:Renewable energy productionposted by Gray Bender on
Hello, I have a question about the ownership of a solar PV array, and how that effects this and any other credit.
Water meters to each tenant area.
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ciaran McCabe on
I assume that waters are not required at each tenant level. Would one water meter for the building suffice the min requirements ?
NC-2009 SSc4.1 - Exemplary Performance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Robert O'Reilly on
We have a Student Housing Development Project in Cincinnati. We are seeking the exemplary Performance Credit for Alternative Transportation Public Transportation Access.
(HERS) index score of at least 75
ND-v2009 GIBc2:Building energy efficiencyposted by mugahid khatib on
for a residential LEED ND project seeking LEED ND Plan certification only, the Homes that are required to achieve at least 75 HERS index. is providing a RESNET HERS model enough , or should the h
Vestibule for going out to a terrace
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Gustavo De las Heras Izquierdo on
The owner wants to let users smoke in a 6mx6m terrace.
pressure drop adjustment System 1
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Can the pressure drop adjustment (e.g. for fully ducted return or for particulate filtration MERV) be applied to System 1?
LEED 2009 NC / C+S Expiration
posted by Maggie Hogan Skaug on
Is there an expiration for LEED 2009 NC and C+S Certified projects? According to USGBC's Guide to LEED Certification, only O+M projects must recertify within 5 years. Thanks
Tracking Categories
NC-v4 EQc2:Low emitting materialsposted by Kerry Honsinger on
If we know were are only going to achieve 3 or 5 categories as compliant, is it still necessary to track all 6 categories and report in the xcel form, or do we just track the categories we think we
LEED v3 Campus Deadline
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.