Topic | Recent |
---|---|
peak flow calculations for 24-hr durationNC-2009 SSc6.1: Stormwater design - quantity controlposted by Chris Olson on Oct 21, 2011, 6:54 pm
Hello - My question is in regards to the 2-yr, 24-hr requirement for calculating peak runoff rate. As far as I understand, by requiring the 24-hr duration to be used with the rational... Last reply: Michael DeVuono, Mar 5, 2012, 8:23 am |
|
How to quantify a evaporation rateNC-2009 SSc6.1: Stormwater design - quantity controlposted by Brian Lodes on Mar 2, 2011, 12:45 pm
I was hoping I could get some advice on obtaining the quantity requirement of SS CR 6.1. We are trying to obtain this credit on an approximate 19 acre site. The site was originally a multi-... Last reply: Michael DeVuono, Mar 4, 2012, 9:31 pm |
|
define what is non-structural control and structural control 6.2NC-2009 SSc6.2: Stormwater design - quality controlposted by carol palansky on Dec 29, 2010, 7:12 pm
In doing our templete, I would like clarity of what each component is and some examples of each. Our company provided the landscaping portion for a green addition and remodel for an office... Last reply: Michael DeVuono, Mar 3, 2012, 9:40 am |
|
green roofNC-2009 SSc6.2: Stormwater design - quality controlposted by Emmanuel Pauwels on Mar 31, 2011, 8:03 am
We will install an extensive green roof in our project. Does anyone know what the runoff rarte is and how much... Last reply: Michael DeVuono, Mar 3, 2012, 9:34 am |
|
TSS removal efficiency % table?NC-2009 SSc6.2: Stormwater design - quality controlposted by Kash Boodjeh on Jul 19, 2011, 5:48 pm
What is the best resource for finding... Last reply: Michael DeVuono, Mar 3, 2012, 9:17 am |
|
Quick clarificationEBOM-2009 SSc4: Alternative Commuting Transportationposted by Wendy Gibson on Oct 8, 2010, 11:29 am
I understand that a compressed work weeks count toward SSc4. What about schedules that falll outside "rush hours" such as a 10am - 7pm shift, or a 7pm - 10am shift? I dont think it would count,... Last reply: Dan Ackerstein, Mar 2, 2012, 8:47 pm |
|
Core & Shell M&VCS-2009 EAc5.1: Measurement and verification - base buildingposted by Randy Cook on Mar 2, 2012, 2:50 pm
Hello, I have read thru the previous posts and responses, and hope this is not a redundant question. I am working on a C&S major renovation. We are going to follow Option B from... Last reply: Marcus Sheffer, Mar 2, 2012, 5:13 pm |
|
Scope of comissioningEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Iris Amdur on Apr 27, 2011, 3:25 pm
Hello- We're working on a building that is not owner occupied and the tenant has 48 additional pieces of equipment that are not a part of the... Last reply: Jacob Arlein, Mar 2, 2012, 3:51 pm |
|
Design or Construction Credit?Pilot-Credits EQpc24: Acousticsposted by Orlin Velinov, PE on Mar 2, 2012, 12:43 pm
Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled. We are at... Last reply: Nicholas Block, Mar 2, 2012, 2:45 pm |
|
Parking Capacity overflow to Gravel LotNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Eduardo Guzman on Jan 24, 2012, 1:00 pm
We have a research building that shares an asphalt parking lot with a warehouse (used by the researchers but not being certified). We have limited our parking capacity to 25% fewer that the ITE... Last reply: Eduardo Guzman, Mar 2, 2012, 12:46 pm |