Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled. We are at a point to submit for design review;
1. Would it be appropriate to leave this credit for construction submittal when we can make measurements in lieu of modeling
2. What would be appropriated sampling strategy to perform the measurements. We have a hotel project with 127 guest rooms and we are planing to measure only 3 rooms which represent the three typical configurations. We have 7 meetings rooms which are in two typical configurations and we are planing to do two sets of measurements, one for each typical condition. For the admin office and the gym areas we are planing to do two additional sets of measurements and analysis.