Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSC 4.2- Bicycle rack

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Giuseppina Amorusi  on 

Hi all, I need an information about the location of the bicycle rack. I’m working on a Core&shell shopping center, less than 300,000 square feet. The shopping center has more entrances at diff

1
Fri Apr 22, 2016, 9:06 am

CCHP Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Jie Shen  on 

Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat reco

1
Mon Apr 25, 2016, 7:28 pm

Paired bus route service

NC-v4 LTc5:Access to quality transit
posted by  Patrice McVeigh  on 

Hi, Is it necessary for both stops to be within 400m of the site in order to satisfy the paired route requirements?

1
Thu May 5, 2016, 10:56 pm

MRP3- minimum square meter for group certification

Hospitality-NC-v4 MPR3:Must comply with project size requirements
posted by  Giuseppina Amorusi  on 

Hi all We are developing a pre-assessment to evaluate the certification level under LEED v4 for a campus. In the campus we have small buildings of about 80 square meters each (hospitality rooms), a

1
Tue Jan 17, 2017, 8:58 pm

PV Panels

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Ciaran McCabe  on 

Can PV panels be installed among a green roof. Whats the official line LEED takes with this.

1
Thu Jan 19, 2017, 2:03 pm

PIf4 Uploads - Site Plan Required

CI-2009 PIf4:Schedule and Overview Documents
posted by  Dee Spiro  on 

Now that the new LEED Online credit forms are active, we're required to upload a site plan for ID+C projects. Previously this was optional.

0

Benchmarking document

General forums
posted by  Brian Ward  on 

Is it too late to get a copy of this document? brian.ward@rpeng.ca

0

LEED NC V2009 - Data Center

NC-2009 EAp2:Minimum Energy Performance
posted by  SW LEE  on 

Our project owner would like to register a Data Center under LEED NC V2009. May I know, do anyone know how to simulate the data center?

1
Mon Apr 25, 2016, 3:46 pm

Parking exhaust

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Emmanuel Pauwels  on 

Do parking spaces or restrooms need to comply with Ashare exhaust rates of table 'TABLE 6-4 Minimum Exhaust Rates'?

1
Tue Apr 26, 2016, 1:02 pm

EAp2

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Peter Doo  on 

If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance Form

1
Mon Apr 25, 2016, 7:14 pm