Forum quick links
Large Retail Spaces
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Martin Meehan on
I am working on a mixed use CS building with a large retail area. The retail space in question has no access to views.
Option 1 Path 2 Mechanical & Electrical Rooms
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Amy Harmon on
I am working on a project that has multiple AHUs serving different types of spaces and we also have several large mechanical and electrical rooms.
Controlled Entry
Pilot-Credits EQpc78:Design for active occupantsposted by Jon Hall on
Option 4 of the design features states: Locate a main staircase to be visible from main building lobby and within 25 foot (7.5 meters) walking distance from any edge of the lobby.
Label Requirements Clarification
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Jon Hall on
While documenting this credit, we noticed that there is some uncertainty regarding the current status of the JUST Label.
Single confirmed Tenant - is a binding lease agreement required?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Alexis Voeltner on
Our client is building a cold dark shell specifically for a tenant (Large grocery store) and the tenant has specified all HVAC, plumbing fixtures, IAQ requirements...
Stadium / Arena
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Stacey Olson on
I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.
CCHP System modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Jie Shen on
My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers.
CREC purchase
CI-2009 EAc4:Green Powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
RCI CORR Information
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by John Danby on
I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.
The envelope data for old building (baseline) are not avaiable
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.