Large Retail Spaces

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Martin Meehan  on 

I am working on a mixed use CS building with a large retail area. The retail space in question has no access to views.

1
Wed Apr 20, 2016, 5:04 pm

Option 1 Path 2 Mechanical & Electrical Rooms

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

I am working on a project that has multiple AHUs serving different types of spaces and we also have several large mechanical and electrical rooms.

1
Wed Apr 20, 2016, 4:32 pm

Controlled Entry

Pilot-Credits EQpc78:Design for active occupants
posted by  Jon Hall  on 

Option 4 of the design features states: Locate a main staircase to be visible from main building lobby and within 25 foot (7.5 meters) walking distance from any edge of the lobby.

0

Label Requirements Clarification

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Jon Hall  on 

While documenting this credit, we noticed that there is some uncertainty regarding the current status of the JUST Label.

0

Single confirmed Tenant - is a binding lease agreement required?

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Alexis Voeltner  on 

Our client is building a cold dark shell specifically for a tenant (Large grocery store) and the tenant has specified all HVAC, plumbing fixtures, IAQ requirements...

1
Mon Sep 12, 2016, 8:18 pm

Stadium / Arena

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Stacey Olson  on 

I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.

1
Mon Mar 6, 2017, 4:13 pm

CCHP System modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Jie Shen  on 

My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers.

1
Tue Apr 15, 2025, 7:37 am

CREC purchase

CI-2009 EAc4:Green Power
posted by  Harpreet Rooprai  on 

I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.

1
Mon Apr 25, 2016, 2:44 pm

RCI CORR Information

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  John Danby  on 

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.

0

The envelope data for old building (baseline) are not avaiable

NC-2009 EAp2:Minimum Energy Performance
posted by  James Lee  on 

Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.

1
Mon Apr 25, 2016, 3:13 pm