Separate Storage Enclosure
NC-2009 PIf2:Project Summary Detailsposted by David Hryvniak on
I am working on a project that has a small, separate generator enclosure/ maintenance building. It is not connected to the building, and it is not conditioned or ventilated.
LEED Project Baundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, We have a 16 story building which is going under major renovation. The new Owner wants to get the building certified as C&s. The issue is that the ground floor will be shared with a Hotel.
LEED user Assembly Calculator for Certified Wood
NC-2009 MRc7:Certified Woodposted by Esther Kohout on
Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.
Exhaust Rates for Enclosed Parking Garages
NC-2009 IEQp1:Minimum IAQ Performanceposted by Diego Pietzsch on
How project teams applying combined a ventilation strategy(Mechanical + Natural) should proceed in order to meet the minimum requirements established in ASHRAE 62.1-2007, Table 6-4, for parking g
Venlilation Spaces Only
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap
3% allowance for non-certified wood?
Pilot-Credits MRpc102:Legal Woodposted by Andres Schwarz on
I wonder if there is an implied allowance for non-certified wood.
Turf-grass area
NC-v4 SSc2:Site development - protect or restore habitatposted by Jody Lee Potvin-Jones on
Hello all. Our site consists of an existed building that is going to be demolished, some paved areas and approximately 30% of green areas with turf-grass and few trees.
Automatic metered urinals
CS-2009 WEp1:Water Use Reductionposted by Ward Miller on
Metered showers and faucets appear to be rather clear based on the available LEED information and the new Water Use Reduction Calculator, but metered urinals appear to be overlooked.
Metered urinals...
NC-2009 WEc3:Water Use Reductionposted by Ward Miller on
Metered showers and faucets appear to be rather clear based on the available LEED information and the new Water Use Reduction Calculator, but metered urinals appear to be overlooked. Does anyone kn
preventive maintenance program
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Kimberly Hosken on
I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.