Sound transmission for moveable partitions
NC-v4 EQc9:Acoustic performanceposted by Anaïs P on
Do the requirements about sound transmission have to be applied for moveable partitions in open-plan office? Achieving the STC values from table 1 betweeen two standards offices separated by a move
Existing Building Renovation with an Addition
NC-2009 EAp2:Minimum Energy Performanceposted by Evelyn Dicks, EI, CxA on
Hello everyone, I'm working on a project where an existing building is being renovated but there is also a smaller new addition extending the building.
Parking for CI 2009 project - LEED project boundary
CI-2009 MPR3:Must use a reasonable site boundaryposted by Ron Dean on
If the Commercial Interior v2009 project has an existing parking that will serve its operations but no construction will be done, should it be included in the LEED project boundary? The CI project
Low Emitting Materials Tracking Spreadsheet
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Patrick Thibaudeau on
Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.
Waste Oil Fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
Enhanced Refrigerant Management - Purchased Cooling Loop
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Vinny Greco on
If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?
parking for fleet vehicle
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Agnieszka Rylska on
In my project there are two areas dedicated for parking.
Service Hot Water Consumption
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, Is there any guidance on what service hot water consumption should be used in the energy model in USgal/h.pers or Lts/day/ person. What would USGBC look out for here ? Thanks in advance.
Interior Cross-Contamination Prevention, Industrial Curtain Wall
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Ashley Wisse on
Our project contains a theater scene shop including a small area where spray paint will occasionally be used.
Attempting to return ceiling tiles from demo
CI-2009 MRc2:Construction Waste Managementposted by Dean Wilson on
We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.