If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use? If the building is only to use chilled water coils from this loop, does this satisfy the requirement?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 02/11/2016 - 07:32

Yes, the campus chiller plant must be included on the calculations, check section 2.6 in the district energy guide http://www.usgbc.org/resources/des-district-energy-systems-guidance-v22-and-v2009-guidance-v20 To my knowledge you do not need additional chillers or heat pumps in the project building to satisfy the credit.