Energy Recovery (G3.1.2.10)
CS-2009 EAp2:Minimum Energy Performanceposted by Andy Fouss on
The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u
Custom Walk-In Freezers and Refrigerators
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by David Hryvniak on
I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.
can hotels be included as 10 unit per acre requirement
NC-2009 SSc2:Development Density and Community Connectivityposted by Rob Hink on
I'm working on a very suburban site and was wondering if I can include a hotel as part of the minimum 10 unit per acre requirement?
net area vs gross area (simulation)
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Panagiota Dadinou on
Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.
Total Site Areas
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.
Oriented Strand Board - OSB
CI-2009 MRc6:Rapidly Renewable Materialsposted by Lorenna Lobo on
Hi, is the oriented strand board - osb considered as rapidly renewable?
Industrial facility in ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Bartlett on
We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.
MRp1 Can a designated dumpster serve as my area of recycling?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Shelly Christman on
Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.
Combining different material credits and options for materials
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Emmanuel Pauwels on
Can we value one and the same product multiple times for different credits and credit options as far as the Building product disclosure and optimization credits is concerned.