Adding up Options 2 and 3?

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Raphael Sperry  on 

The credit language here says "For credit achievement calculation, the value of individual products compliant with either option 2 or 3 can be combined to reach the 25% threshold but products compl

1
Fri Sep 11, 2015, 5:44 pm

"Rain event" definition

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Noriko Nagazumi  on 

Hello. Would someone please define "rain event"? Is it the total rain since the beginning to the stop of a rain?

1
Fri Sep 11, 2015, 6:25 pm
1
Fri Nov 27, 2015, 5:52 pm

Painting or Coating for Steel Structure

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Ali Soufan  on 

Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli

1
Sun Jan 31, 2016, 3:51 am

SS PC27 - a short feedback

CS-2009 IDc1:Innovation in Design
posted by  Elodie DUMAS  on 

Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim

0

Coco, Coir, or other fiber mats

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Erica Downs  on 

Anyone have experience with how to treat coco fiber mats?

1
Fri Nov 27, 2015, 8:30 pm

Smoke-free Campus

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Kim Wajda  on 

The project in question is part of a high school campus with a strict campus-wide smoke-free policy.

1
Fri Sep 11, 2015, 3:51 pm

Co-working space

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, My project is a co-working space for multiple companies. The tenants won't be assigned a fixed space to work in, and there are common spaces where anyone can sit down and work.

1
Mon Sep 14, 2015, 1:04 pm

Permanent Exhibit Vs Temporary Exhibit

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Ralph Bicknese  on 

Hello, This question is also related to any interior LEED credit. We are designing an exhibition space for a museum. This exhibition space has Temporary and Permanent Exhibitions.

1
Sun Oct 4, 2015, 10:09 pm

Calculating material use for mock-ups.

NC-2009 MRc4:Recycled Content
posted by  Peter Doo  on 

When working on large projects with substantial mock-ups, should one include these materials in the project documentation?

1
Sat Sep 12, 2015, 12:10 am