Adding up Options 2 and 3?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Raphael Sperry on
The credit language here says "For credit achievement calculation, the value of individual products compliant with either option 2 or 3 can be combined to reach the 25% threshold but products compl
"Rain event" definition
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Noriko Nagazumi on
Hello. Would someone please define "rain event"? Is it the total rain since the beginning to the stop of a rain?
Interpretation for Underground Stormwater Retaining System
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Candice Rogers on
Good morning - We have a project that is greenfield.
Painting or Coating for Steel Structure
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ali Soufan on
Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli
SS PC27 - a short feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim
Coco, Coir, or other fiber mats
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Erica Downs on
Anyone have experience with how to treat coco fiber mats?
Smoke-free Campus
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Kim Wajda on
The project in question is part of a high school campus with a strict campus-wide smoke-free policy.
Co-working space
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Gustavo De las Heras Izquierdo on
Hallo, My project is a co-working space for multiple companies. The tenants won't be assigned a fixed space to work in, and there are common spaces where anyone can sit down and work.
Permanent Exhibit Vs Temporary Exhibit
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Ralph Bicknese on
Hello, This question is also related to any interior LEED credit. We are designing an exhibition space for a museum. This exhibition space has Temporary and Permanent Exhibitions.
Calculating material use for mock-ups.
NC-2009 MRc4:Recycled Contentposted by Peter Doo on
When working on large projects with substantial mock-ups, should one include these materials in the project documentation?