Forum quick links
new chiller plant to be added with new project
posted by Mike Stopka on
Hello I was told by our engineers that in order to use a chiller plant, it needed to be documented for at least 1 year of operation. Is it possible to take advantage of a new chiller plan to be b
EQ credit 6. Interior Lighting Question.
NC-v4 EQc6:Interior lightingposted by Jae Yong Park on
Hi all, I'm currently working on a research center which is located in South Korea. EQ credit 6. Interior Lighting Option 1.
pressure drop adjustemnt in the baseline model
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I have two questiones: 1.
Green walls
NC-v4 WEc1:Outdoor water use reductionposted by Julien Richard on
Hi, Do we have to include green walls in the calculation ?
100% On site Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Natatorium Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carl Karlen on
I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.
Download Forms
NC-2009 PIf1:Minimum Program Requirementsposted by Ralph Bicknese on
Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef
Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.
Accidentally Opened Awarded Credit during Appeal Stage
posted by Bernard Sagaiyaraj on
My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.
Off-Site Solar Used to Power 100% of Building Electricity
CS-2009 EAc6:Green Powerposted by Heather South on
I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin