Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

new chiller plant to be added with new project

General forums
posted by  Mike Stopka  on 

Hello I was told by our engineers that in order to use a chiller plant, it needed to be documented for at least 1 year of operation. Is it possible to take advantage of a new chiller plan to be b

1
Thu Mar 3, 2016, 3:07 pm

EQ credit 6. Interior Lighting Question.

NC-v4 EQc6:Interior lighting
posted by  Jae Yong Park  on 

Hi all, I'm currently working on a research center which is located in South Korea. EQ credit 6. Interior Lighting Option 1.

1
Tue Dec 1, 2015, 5:36 pm
1
Mon Aug 31, 2015, 1:57 pm

Green walls

NC-v4 WEc1:Outdoor water use reduction
posted by  Julien Richard  on 

Hi, Do we have to include green walls in the calculation ?

1
Wed Aug 12, 2015, 2:03 pm

100% On site Infiltration

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Rodrigo Tonda  on 

Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).

1
Fri Nov 27, 2015, 3:05 am

Natatorium Locker Rooms

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Carl Karlen  on 

I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.

0

Download Forms

NC-2009 PIf1:Minimum Program Requirements
posted by  Ralph Bicknese  on 

Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef

1
Sat Jan 16, 2016, 3:23 am

Brownfield Documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Ivan Romero  on 

I've scanned the discussions on Brownfield and didn't see this addressed directly.

1
Thu Aug 20, 2015, 9:12 pm

Accidentally Opened Awarded Credit during Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Bernard Sagaiyaraj  on 

My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.

1
Tue Aug 25, 2015, 1:06 pm

Off-Site Solar Used to Power 100% of Building Electricity

CS-2009 EAc6:Green Power
posted by  Heather South  on 

I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin

1
Fri Aug 21, 2015, 2:18 pm