"Preserve from development activity 40% of the greenfield area"
NC-v4 SSc2:Site development - protect or restore habitatposted by Natalie Otoole on
Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.
Apparatus bay of Fire Department
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Laura Charlier on
HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.
is a tenant lease agreement applicable here?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Alfonzo Collins on
I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?
Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Conveying systems now accepted for this credit
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Conveying systems now accepted for this credit
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Location of Co2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Stella Stella on
Hi, We have a project where in IEQ C1 was attempted when almost the construction was already completed.
Case 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Mike D on
The project has 2500 FTE and occupies more than 75% of the building space. The building has only 5 parking spaces, so cannot meet the 5% required for the carpool/vanpool.
Stormwater Management Plan
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nisreen Alhussein on
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?
Roof area exempt from the SSc7.2 calculation
NC-2009 SSc7.2:Heat Island Effect—Roofposted by FABIO VIERO on
We have a project with a terrace that is about 50% of the building roof.