"Preserve from development activity 40% of the greenfield area"

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Natalie Otoole  on 

Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.

1
Fri Jul 31, 2015, 1:20 am

Apparatus bay of Fire Department

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Laura Charlier  on 

HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.

1
Fri Jul 10, 2015, 12:36 am

is a tenant lease agreement applicable here?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Alfonzo Collins  on 

I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?

1
Fri Jul 10, 2015, 2:32 pm

Conveying systems now accepted for this credit

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Paula Melton  on 

A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who

0

Conveying systems now accepted for this credit

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Paula Melton  on 

A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who

0

Location of Co2 sensors

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Stella Stella  on 

Hi, We have a project where in IEQ C1 was attempted when almost the construction was already completed.

1
Fri Jul 10, 2015, 1:42 am

Case 2

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Mike D  on 

The project has 2500 FTE and occupies more than 75% of the building space. The building has only 5 parking spaces, so cannot meet the 5% required for the carpool/vanpool.

0

Stormwater Management Plan

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Nisreen Alhussein  on 

I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?

1
Fri Jul 10, 2015, 12:29 pm

Roof area exempt from the SSc7.2 calculation

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  FABIO VIERO  on 

We have a project with a terrace that is about 50% of the building roof.

1
Fri Nov 27, 2015, 3:07 am