Forum quick links
Base building system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Graham Langton on
Hi, To what extent does the base building system need to be entered into the VRP calculator?My CI project spaces is carried out space by space but that level of detail for other tenants isn't ava
Pick up and Drop Facility
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Priyadarsi Das on
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.
SSc4.3: "publicly posted at the entrance of the parking area"
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greengrade User on
Our project is a classroom and faculty office building with an occupancy calculated at 89 FTE and 707 peak transients located on an urban college campus .
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize Energy Performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
SSc4.2 alternative
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Greengrade User on
I understand USGBC will allow NC-v4 LTc6: Bicycle facilities as an alternative compliance path to SSc4.2.
District Energy Treatment in LEEDv4
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Is there any new guidance or published changes for modeling district energy loops in LEED v4?
Exception to Vestibules in ASHRAE?
NC-2009 EAp2:Minimum Energy Performanceposted by Sara Greenwood on
Hello, I am working on a project in Climate Zone 4 and was wondering if there is any guidance that pertains to buildings with entries that open to a ventilated parking structure which would allow u
LEED NC for new office buiding
posted by Fabio Frescia on
Dear all, I have a client asking me for a consultancy proposal for LEED NC certification for a new office building, 4 story, GFA 1,500 m2. They would like LEED Gold.
NC-v4 SSc5: Site Assessment (Previously developed)
NC-v4 SSc1:Site assessmentposted by Neshat Sakeena on
I am trying to populate the Site Assessment Worksheet. What does USGBC mean by "Human Views - View Corridors"? Any guidance on filling this template is welcome.
G3.1.3.14
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I am not sure that I am interpreting section G3.1.3.14 in the correct way.