Forum quick links
Submission of Design Cr. during Constr. Final Rev. f. 2nd round
posted by Lise Dannesboe on
Hi! Split-Review project: We submitted a Design credit for Design Prelim Review and for the Final Design Review, I would like to put this credit on hold and first submit for a second round of revie
Space usage type - kitchen
CS-2009 PIf3:Occupant and Usage Dataposted by Thomas Baltsersen on
We got a comment back from preliminery review regarding kitchen in an office building. We defined these Spaces as retail general which apparently was incorrect.
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Construction - Indoor Air Quality V2009
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Noelle Hunner on
Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?
v4 Project on 2009 Campus
posted by Edwin van Eeckhoven on
Dear all, I am working on a LEED CS 2009 project on a 2009 Master site. Our ambition is that the next up coming project is to be a v4 project.
FTE Calculations for the Train Station (LEED CS 2009)
CS-2009 PIf3:Occupant and Usage Dataposted by Orçun Özhelvaci on
Hello Everybody, We have a Rapid Train Station Mixed-Use Project consisting of Train Station Building, which encloses Hotel, Mall and Offices.
Compliance for Proposed New Buildings
ND-v4 GIBp3:Indoor water use reductionposted by Philippa Cameron on
For some prerequisites and credits, including energy and water consumption, LEED ND includes compliance requirements for new buildings.
Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction Waste Managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
Does the 5 days/week requirement apply for the project duration?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Tiffany King on
In the calculations for >50,000 SF project, it says you have to count all personal that work a minimum of 5 days/week on the project.
LEED excluded areas within LEED project boundary
CI-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
A commercial tenant has a lease on a whole building.