Forum quick links
Development Density Calculations
CS-2009 SSc2:Development Density and Community Connectivityposted by Amanda Johnson on
For the Development Density calculations our project has an 880 ft DD radius .
Dual Showerheads
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Pia Öhrling on
We have a hotel where the showers have two showerheads. One showerhead placed overhead and one han-held showerhead. They have different flow-data.
All or the Main street frontages 1:1.5
Pilot-Credits PC14:Walkable Streetsposted by Ian McCall on
Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.
Certify only a few stories
CS-2009 MPR3:Must use a reasonable site boundaryposted by Citlali Mora Bello on
Hello, Can a building tower be certified only a few floors? The justification is that the tower is owned by different parties, and not all of them wants the certification.
VRV Units Prescriptive Compliance in LEED CI 2009
CI-2009 EAp2:Minimum Energy Performanceposted by Himanshu Dehra on
The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16).
Lighting control in Tenant space
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
Plastic Sheeting to Protect Raised Technical Floor
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ian McCall on
Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.
Existing Conditions
NC-v4 WEp1:Outdoor water use reductionposted by Craig Graber on
This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.
LEED for Homes framing with light-gauge metal
Mid-Rise-v4 MRp2:Durability managementposted by Robyn Vettraino on
Does anyone know of any interpretations in the LEED-H Midrise regarding the MR1.2, Detailed Cut List and Lumber Order, when you aren't using lumber, but using light gauge framing instead.
LEED CI proposal
CI-2009 EAp2:Minimum Energy Performanceposted by Fabio Frescia on
Hi all, I am about to prepare a proposal for a client that wants to renovate his 2 story office inside a 20 years old building and he wants LEED CI certification. Do I need to include an energy sim