Forum quick links
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Stormwater not going to municipal infrastructure
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michael Wahjudi on
We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure.
Exemplary performance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by LEEDme Lorenzi on
Our project is a renovation located near a metro station and near four bus stop.
registering a project
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Megan Bove on
Good morning. I am trying to register a project that is 7,893.3 square feet.
Casework - Combination of New and Salvaged/Repurposed Material
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Russell Philstrom on
I am working on a project that has the client moving into a new building from their existing space.
Core and Shell Scope & Tenant Scope
CS-2009 MRc5:Regional Materialsposted by Osama Hassan on
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.
Is this Pilot credit closed?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Stella Stella on
Hi All, we are pursuing a LEED BD+C project and would like to register for this credit but it says the Pilot credit closed?