Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

Where do I upload the response report for Design Final Package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Mon Jun 1, 2015, 9:05 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Fri May 22, 2015, 1:33 pm

Where do I upload the response report for Design Final Package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Fri May 22, 2015, 1:34 pm

Stormwater not going to municipal infrastructure

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Michael Wahjudi  on 

We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure.

1
Fri May 22, 2015, 9:51 am

Exemplary performance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  LEEDme Lorenzi  on 

Our project is a renovation located near a metro station and near four bus stop.

1
Wed Aug 12, 2015, 7:42 am

registering a project

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  Megan Bove  on 

Good morning. I am trying to register a project that is 7,893.3 square feet.

1
Fri Nov 27, 2015, 3:33 am

Casework - Combination of New and Salvaged/Repurposed Material

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Russell Philstrom  on 

I am working on a project that has the client moving into a new building from their existing space.

1
Mon Jun 1, 2015, 8:53 pm

Core and Shell Scope & Tenant Scope

CS-2009 MRc5:Regional Materials
posted by  Osama Hassan  on 

Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.

0

Is this Pilot credit closed?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Stella Stella  on 

Hi All, we are pursuing a LEED BD+C project and would like to register for this credit but it says the Pilot credit closed?

1
Mon Aug 10, 2015, 10:17 pm