Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project on Hold

General forums
posted by  Nereyda Rodriguez  on 

Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.

1
Tue Apr 14, 2015, 4:02 pm

C&S 2009 Retail tenant space

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  London Huenefeld  on 

I am working on a C&S project in which most of the tenants are retail stores.

1
Tue Sep 20, 2016, 4:11 pm

Pressure drop adjustment factor with DOAS System

CS-2009 EAc1:Optimize Energy Performance
posted by  Curtis Clark  on 

In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.

1
Thu Apr 9, 2015, 2:51 pm

MR c7 forms

NC-2009 MRc7:Certified Wood
posted by  Mark Ramsey  on 

As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.

1
Mon Apr 13, 2015, 3:04 pm

SHGC Value ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  John Covello  on 

Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.

1
Thu Apr 9, 2015, 2:14 pm

Tricky project - NC, C&S or EBOM?

LEED Rating System Selection
posted by  Maria Glädt  on 

Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b

1
Fri Nov 27, 2015, 6:18 pm

WEp1 for Shopping Center

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

Hello all, We have a shopping center interested in certification with 10 buildings.

1
Sat Jan 16, 2016, 2:13 am

Air Quality Testing - Elevator Lobbies in Parking Garage

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Katherine Wilde  on 

Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above.

1
Fri Nov 27, 2015, 8:44 pm

MRc7 How does this credit work?

NC-2009 MRc7:Certified Wood
posted by  Sara Axon  on 

If we are asked to provide for 1 point or 50% FSC Wood by cost but are making casework, do we have to ship the casework as FSC certified?

1
Thu Apr 9, 2015, 5:55 pm

FSC Certified Millwork

NC-2009 MRc7:Certified Wood
posted by  Andy Prestridge  on 

We have a fair amount or T&G wood that is being installed on the Ceiling.

1
Thu Apr 9, 2015, 5:58 pm