Forum quick links
Sensors calibration during the performace period
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Agnieszka Rylska on
Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?
Core&Shell Inheritance
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Redy Truccolo on
Hi everybody, I have a CS2009 certified project and now I'm working on its CI2009 certification, which will be applied to the whole building area (there is only one tenant). My question is, since
Prevention Through Design - LEED Pilot
posted by Denise Bender on
We have a design review tool for new and existing construction projects that incorporates a decisional aid for identifying Environment, Health, Safety and sustainabiliy issues and what measures are
Energy rate of DES Energy simulation
NC-2009 EAc1:Optimize Energy Performanceposted by Renaud Gay on
Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.
LEED EQ 4.2 Wallpaper Compliance
posted by Saahiti Penigalapati on
One of the credits we are attempting on a LEED project is the EQ 4.2 (Low Emitting Materials-Paints and coatings).
management plan update after preliminary review
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Noriko Nagazumi on
We received a comment to revise our management plan on the preliminary review. Should we update the date of the plan? The date would come after the performance period...
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
2009 calculator - "private" bathrooms in a commecial facility
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jessica Hawley on
I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.
Project Sites within a LEED ND Boundary
posted by Philippa Cameron on
There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss
CORE area and SHELL area
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.