Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Sensors calibration during the performace period

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Agnieszka Rylska  on 

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?

1
Thu Dec 10, 2015, 3:18 pm

Core&Shell Inheritance

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Redy Truccolo  on 

Hi everybody, I have a CS2009 certified project and now I'm working on its CI2009 certification, which will be applied to the whole building area (there is only one tenant). My question is, since

0

Prevention Through Design - LEED Pilot

General forums
posted by  Denise Bender  on 

We have a design review tool for new and existing construction projects that incorporates a decisional aid for identifying Environment, Health, Safety and sustainabiliy issues and what measures are

1
Wed Apr 1, 2015, 12:09 pm

Energy rate of DES Energy simulation

NC-2009 EAc1:Optimize Energy Performance
posted by  Renaud Gay  on 

Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.

1
Tue Mar 24, 2015, 4:27 pm

LEED EQ 4.2 Wallpaper Compliance

General forums
posted by  Saahiti Penigalapati  on 

One of the credits we are attempting on a LEED project is the EQ 4.2 (Low Emitting Materials-Paints and coatings).

1
Wed Apr 1, 2015, 12:08 pm

management plan update after preliminary review

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Noriko Nagazumi  on 

We received a comment to revise our management plan on the preliminary review. Should we update the date of the plan? The date would come after the performance period...

1
Mon Jan 4, 2016, 9:30 pm

Commissioning Requirements Off-site

Credit Forums
posted by  Alicia Villanueva  on 

Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.

0

2009 calculator - "private" bathrooms in a commecial facility

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Jessica Hawley  on 

I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.

1
Sun Mar 22, 2015, 10:51 am

Project Sites within a LEED ND Boundary

General forums
posted by  Philippa Cameron  on 

There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss

0

CORE area and SHELL area

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Yodi Danusastro  on 

How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.

1
Mon Mar 30, 2015, 1:17 am