Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ID credits for Homes

LEED for Homes (LEED-H) Forum
posted by  Keelan Kaiser  on 

Hi, are there ID credits available in Homes for Green Power and Green Cleaning that someone could point me to?

1
Thu Mar 24, 2016, 10:45 pm

Documentation for Plan

ND-Plan-v4 GIBp1:Certified green building
posted by  David West  on 

For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.

1
Sat May 9, 2015, 7:09 pm

Datacentre Requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Priyadarsi Das  on 

Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.

1
Wed Feb 11, 2015, 11:34 pm

Sound Transmission - achievable?

NC-v4 EQc9:Acoustic performance
posted by  Tim Habraken  on 

For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.

1
Wed Feb 4, 2015, 7:59 pm

Monitoring Period

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Mari Hamasaki  on 

What is the required monitoring period for this credit?

0

What is the difference

NC-2009 IEQp1:Minimum IAQ Performance
posted by  John Pugh  on 

What is the difference between breathing zone outdoor airflow and room outdoor airflow rate? How do I find the room outdoor airflow rate for bedroom/living room type spaces Thanks.

0

Reduction of impervious area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Danielle Spicer  on 

I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e

1
Thu Feb 5, 2015, 3:46 pm

audit of land-fill materials only?

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Jutta Berns  on 

our hotel project already has in place a rigorous waste diversion programme, where 80%+ is diverted from landfill.

1
Thu Feb 5, 2015, 4:56 pm

Flush-Out Requirement for a Naturally Ventilated Building

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Eric Carbonnier  on 

The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.

1
Thu Mar 19, 2015, 10:43 pm

Arrival of tenants in a LEED CS building

LEED Rating System Selection
posted by  Devanand Ragbir  on 

Our CS building is scheduled for commissioning end of August. Can tenants start outfitting their spaces before this date which will enable their employees to work from September.

1
Thu Feb 5, 2015, 8:17 pm