Forum quick links
IEQp2 Implementation Timeframe
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Bradley Konkel on
At what point of the project do the standards regarding IEQp2 take effect?
Parking for LEFE car in the basement
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Indochine Engineering VN on
Hi all, I have a project with 4 basements serving as underground parkings. I have a question: will LEFE car parking always locate in the basement 1 near the entrance?
Recirculated Air
NC-2009 IEQp1:Minimum IAQ Performanceposted by Emmanuel Pauwels on
We are working on a small building that will operates for conferences and private events. There will be a kitchenette or coffee point (only microwave, coffe maker and refrigerator).
Regional Material in Non LEED building
NC-2009 MRc5:Regional Materialsposted by jack larson on
Within my LEED boundary are two buildings, One is a LEED building, the other is not ....
Commissioning Agent or Authority-Difference & Does Size Matter?
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Michelle Bracewell-Musson on
Hello, I have researched, and for some reason have missed the boat when it comes to the difference between a Commissioning Agent and Authority and when (which prerequisites and credits) you must u
Tenant retail areas, non-regularly occupied Space?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by TOMAS URIBE on
Hello there! Based on the Reference Guide Correction ID#100001102 made on 11/01/2011: "Non-regularly occupied spaces are spaces that occupants pass through, or spaces used in pursuit of focused a
ETo units and ETo calculation software
NC-2009 WEc1:Water Efficient Landscapingposted by Renaud Gay on
Hi all, I'd like to ask again the same question that in LEED form ETo is expressed in inch/month for July. This is not super clear but looks like this.
Independence of CxA - enhanced commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Qian Tang on
Hello experts, i'm not sure about the independence of the CxA at enhanced commissioning for a projekt lager than 50,000 ft2. Is the CxA allowed to be a member of a subsidiary firm of the builder-o
Motor Power
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear All, For modelling pumps for my Proposed design, I have a manufacturer's datasheet for a Variable speed pump (Secondary pump) with the following values: Duty Flow = 209.5 gpm Du
LEED NC Credit EAc2 for LEED ID+C project as an ID credit
CI-2009 IDc1:Innovation in Designposted by Amit Ahiel on
I have researched this and see that we can earn credit for a Thermo Solar Water system on a LEED ID+C project. The question is, will we only earn 1 point or the full set of points per the NC system