Industrial Condominium Certification

LEED Guidance for Campuses and Multiple Buildings
posted by  Tamara Quiroz  on 

A real state firm ask us for a valid certification for a Industrial Condominium project of 400 hectares approx.

0

Bamboo flooring materials

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Lilian Seow  on 

What are the documents required from the contractor to complete this credit?

1
Fri Nov 27, 2015, 7:44 pm

Option 2 - one time fee or annually

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Lorne Mlotek  on 

I noticed that in EBOM v4 the financial contribution of $0.05 must occur annually Seeing as this is $0.40, am I correct to assume it is a one-time fee?

1
Wed Apr 15, 2015, 9:55 pm

Interior Lighting Power Requirement in ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language

1
Fri Aug 15, 2014, 2:24 pm

Vestibules

NC-2009 EAp2:Minimum Energy Performance
posted by  Viktor Reutherborg  on 

I'm working on a big building, mostly office but not exclusively, in Stockholm, Sweden. I'm currently working on a restaurant on the ground floor with an entrance from outside.

1
Fri Aug 15, 2014, 2:29 pm

Site plan without smoking areas

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Anna Korinkova  on 

Hello LEEDusers! We are supposed to upload a site plan/map that shows the location of the designated outdoor smoking /nonsmoking areas.

1
Fri Aug 15, 2014, 1:49 pm

Reporting and metering frequency

NC-v4 WEc4:Water metering
posted by  Lorne Mlotek  on 

In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi

1
Tue Apr 21, 2015, 4:55 pm

A tower, podium and shared parking on the same site, LEED NC2009

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Mais B  on 

Hi all, I have posted this last week but i haven't got any replies so i am re-posting: "We have an administration complex consisting of two basement levels having parking and utility rooms, and ab

0

SSp1 description for CS precertification

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Nándor Kovács  on 

We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site. Can so

1
Mon Aug 18, 2014, 11:58 am

"Access to Occupants"

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Omar Elrawy  on 

Dear All, I have a 6 story office building with one garbage shoot linked to a garbage sorting room outside the building but within the LEED project boundary.

1
Mon Aug 18, 2014, 6:14 pm