Industrial Condominium Certification
posted by Tamara Quiroz on
A real state firm ask us for a valid certification for a Industrial Condominium project of 400 hectares approx.
Bamboo flooring materials
NC-2009 MRc6:Rapidly Renewable Materialsposted by Lilian Seow on
What are the documents required from the contractor to complete this credit?
Option 2 - one time fee or annually
NC-v4 SSc2:Site development - protect or restore habitatposted by Lorne Mlotek on
I noticed that in EBOM v4 the financial contribution of $0.05 must occur annually Seeing as this is $0.40, am I correct to assume it is a one-time fee?
Interior Lighting Power Requirement in ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language
Vestibules
NC-2009 EAp2:Minimum Energy Performanceposted by Viktor Reutherborg on
I'm working on a big building, mostly office but not exclusively, in Stockholm, Sweden. I'm currently working on a restaurant on the ground floor with an entrance from outside.
Site plan without smoking areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Anna Korinkova on
Hello LEEDusers! We are supposed to upload a site plan/map that shows the location of the designated outdoor smoking /nonsmoking areas.
Reporting and metering frequency
NC-v4 WEc4:Water meteringposted by Lorne Mlotek on
In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi
A tower, podium and shared parking on the same site, LEED NC2009
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mais B on
Hi all, I have posted this last week but i haven't got any replies so i am re-posting: "We have an administration complex consisting of two basement levels having parking and utility rooms, and ab
SSp1 description for CS precertification
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Nándor Kovács on
We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site. Can so
"Access to Occupants"
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Omar Elrawy on
Dear All, I have a 6 story office building with one garbage shoot linked to a garbage sorting room outside the building but within the LEED project boundary.