FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Interior Lighting Power Requirement in ASHRAE 90.1-2007

I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language only states that Mandatory Provisions (Section 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) in 90.1-2007 has to be fulfilled. The Building Area Method and Space-by-Space Method is described under section 9.2.2 as well as 9.5 and 9.6. I understand that either method has to be used in the energy modeling, but is it allowed to e.g. install 12 W/m2 in an office building and in the energy model take a minor penalty due to higher electricity usage in the Proposed model compared to the Baseline model (11 W/m2), as long as the 10 % overall efficiency is achived?

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 08/15/2014 - 14:24

Yes. Since the interior lighting power density is not a mandatory provision it is available for tradeoff. You can go over the lighting energy use as long as you make up the savings elsewhere and get to the minimum percentage.