Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Residential Type Sinks in Middle School Classroom

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sara Zoumbaris  on 

Hi, We are working on a middle school that has 2, Home Economics classrooms with residential kitchen-style fixtures; I would assume these should be included within my calculation?

1
Wed Dec 30, 2015, 4:35 pm

Chemical/Hazardous Gas Area Separation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Jason Warner  on 

We have a project that has a garage which needs to have self-closing doors and deck to deck walls or hard lid to other areas.

0

calculating FTE

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Charli Holt  on 

I am working on a project in Hammond, LA for a university. The building is 2,000 sqft and is a "teaching sustainability center". I am unsure on how to calculate the FTE's for WEp2 etc.

1
Mon Jul 7, 2014, 6:27 pm

Commissioning Manual and Report

NC-2009 EAc3:Enhanced Commissioning
posted by  Jalal Avades  on 

Our project commissioning exercise filled more than 30 binders and if we scan them and upload them it will be couple of Giga Bytes of files.

1
Mon Jul 7, 2014, 6:31 pm

ACEEE list

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Analu Granda  on 

Hi! I've been looking everywhere for the last list of green cars with a 40 score of ACEEE at greencars.org and it seems that it isn't in the web anymore... Can you please help me???

1
Tue Jul 8, 2014, 3:48 am

Gross Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Indochine Engineering VN  on 

Hi! My project is using double glazing facade, there is inner glass at the floor, then big air gap and the outer glass that is hang by a steel structure.

1
Sat Jul 26, 2014, 5:01 am

FIre station modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  David Hahn  on 

I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.

1
Tue Jul 8, 2014, 3:08 pm

Large footage residence and threshold adjustment

LEED for Homes (LEED-H) Forum
posted by  LEED Pro Consultant  on 

Hello. We are in the very first steps in our first LEED Home.

1
Wed Jul 9, 2014, 2:50 am

Regional- Additives Taken into Consideration?

CS-2009 MRc5:Regional Materials
posted by  Roberto Meza  on 

I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp

1
Tue Jul 8, 2014, 10:58 pm

CS MPR2: reclaimed land without development previously

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Vivien Wong  on 

Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement

0