90% refer to what?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Jens Apel  on 

I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site.

0

applying only for EAc5.2 not EAc5.1

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Anna Bak  on 

Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.

1
Thu Jun 12, 2014, 2:27 pm

clarification question on credit

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Melissa Elkins  on 

Our Engineering firm didn't include our water heating system in the original commissioning report, so our credit needs to be clarified - they did conduct a functional test so I'm wondering if I jus

1
Fri Jun 13, 2014, 12:23 pm

Disinterested Sub-contractor of MEP Design Firm?

NC-2009 EAc3:Enhanced Commissioning
posted by  Anthea Ng  on 

Hello. For achieving EA C3 Enhanced Commissioning, Wwe noted the clause in guidebook "Must not be an employee of the design firm, though he or she may be contracted through them".

1
Fri Jun 13, 2014, 12:37 pm

Ventilation - Proposed and Baseline per ASHRAE 62.1-2007?

NC-2009 EAp2:Minimum Energy Performance
posted by  Todd Tewksbury  on 

Hi! I am conducting a LEED v2009 EAp2/c1 energy model for a nonresidential building that is more than 5 floors.

1
Tue Jun 17, 2014, 1:46 pm

Expansion project FLUSH OUT

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jorge Torres-Coto  on 

We have a project that is an expansion to an existing facility. It is NOT an addition.

0

Submitting for Review & Terminolgy

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

Just submitted a CI v2009 project for final (combined) review. Initially I was getting error messages that it could not be submitted unless all Prereqs & Credits were marked "complete".

1
Mon Jun 16, 2014, 9:23 am

Multi zone or 100%OA ?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SW LEE  on 

Our project is use VRF system to keep the space cool. We also provide dedicated injection fan (DOAS) as to meet 62.1 requirement. Most space will have indoor cassette unit.

1
Tue Jun 17, 2014, 3:06 pm

LEED AP BD+C after LEED GREEN ASSOCIATE EXAMS

General forums
posted by  GOVINDACHARI SUNDARARAJAN  on 

Dear sir/Madam, I have passed LEED-Green Associate Exam on June-13th 2014, i am planning to takeup LEED AP BD+C in the next 3 months, i have a query as below, if i take up LEED AP BD+C, is it tha

0

Increasing the indoor operative temperature

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Stella Stella  on 

Hi, we are doing a project in South east Asia for LEED NC.

1