Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Rainwater capture artificial retention pond

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  John Covello  on 

Hello, We are looking to use rainwater capture to provide for our site's sanitation and irrigation needs. There is no potable water actually available for the site currently from local sources.

1
Thu May 15, 2014, 5:51 pm

Project Registration Required

General forums
posted by  Lewis Hewton  on 

Is there a way to review the new system without officially registering a new project (and completing the certification agreement)?

1
Wed Jul 23, 2014, 2:10 pm

All sanitary installations will only be built at tenant fit-out

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Mark Frey  on 

We are working on the LEED Core&Shell (v3, 2009) project in Switzerland .

1
Sat Jul 26, 2014, 11:11 am

Water heating equipment efficiency

NC-2009 EAp2:Minimum Energy Performance
posted by  Renato Sandoval  on 

As a non-us consultant I always have a problem attending the EA.P2 requirement.

1
Fri May 16, 2014, 12:13 am

Brand New - Raw space

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Ruben Garza  on 

If Ihave a project that is going into a brand new development where the tenant space simply has open stud exterior walls and storefront and no slab or ceilings (only exposed podium concrete deck)..

1
Wed Dec 30, 2015, 4:26 pm

VAV minimum flow set points

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, Appendix G3.1.3.13 says "Minimum volume setpoints for VAV reheat boxes shall be 2.15 L/s·m2 of floor area served or the minimum ventilation rate, whichever is larger" When you have a HVAC sys

1
Tue May 27, 2014, 3:53 pm

Energy & Atmosphere

NC-2009 EAp2:Minimum Energy Performance
posted by  GOVINDACHARI SUNDARARAJAN  on 

I am appearing for LEED GA Exam on June-9th 2014, i need a clarification as below, in this website in EA and in each of the credit like EA: Pre requisite-2: Min Energy Performance There are option

1
Tue May 27, 2014, 3:45 pm

Project Incomplete Before End of Performance Period

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Greengrade User  on 

Do all the purchases of materials that will be needed for a construction project need to be made during the performance period?

1
Fri May 30, 2014, 5:12 pm

LEED Green Associate Exam & LEED AP BD+C before June 15

General forums
posted by  Juan Manuel Samayoa  on 

So here’s the Question: On June 14th 2012 I took the LEED Green Associate Exam and passed. If I want to maintain my credential: “LEED Professionals maintain their credential by earning continuing e

1
Mon May 19, 2014, 5:24 pm