We are working on the LEED Core&Shell (v3, 2009) project in Switzerland . The core&shell project does not include sanitary installations in the scope of work, which will only be built at tenant fit-out stage. Only the Core&Shell work is done by the owner. The tenant will rent the entire floor area and take over the entire tenant work. We have a C&S project with no signed tenants yet. The owner is providing no fixtures for the tenants in the base C&S project. The core and shell scope includes no fixtures (toilet/sink/shower). All fixtures are installed by the tenant. How can we comply with WEp1? We strive for no points for WEc3 Water Use Reduction.
Do we need a binding lease agreement that the future tenant will complete the build-out with 20% more efficient plumbing fixtures and fitting? The owner prefers to do without a binding lease agreement if possible.
Or are we exempt from WEp1 because our C&S project does not include any regulated plumbing fixtures?
I read already the Core and Shell Appendix 4 in the back of the LEED Building Design and Construction Reference Guide.
Thank you very much for your feedback!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11477 thumbs up
July 26, 2014 - 7:11 am
Camill, I think CS Appendix 4 spells this out pretty clearly. If you're going to claim savings from tenant work you need a tenant sales or lease agreement.