LEED CS with partially occupied building
posted by alessandro speccher on
hello everybody, this is my first post on leeduser and I want to start giving compliments to everybody are sharing so lot of knoweledge; returning to building, a design team described me this conte
Greenhouse Program
Schools-2009 IDc1:Innovation in Designposted by Larry Turbes on
The elementary school we're working on will have a greenhouse for growing primarily food products, with the aim of teaching students where food comes from and what the associated environmental/heal
LEEDuser IPM template updated
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Tristan Roberts on
LEEDuser has updated our IPM template that is available to members in the Documentation Toolkit above.
EP credit
EBOM-2009 IEQc2.4:Daylight and Viewsposted by ethan adams on
What will be the minimum % of views to qualify for exemplary performance when version 4 begins?
LEED Project boundary and adjacent road.
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lawrence Lile on
We are building a LEED project next to an existing road. It is a gravel road owned by the same entity that owns the LEED project, and they also own the property across the road.
2 different system in LEED Boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by SW LEE on
Hi, In our project, we have 2 different ventilation system.
Rainwater
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by FABIO VIERO on
Hi, I'm now working on a project under LEED certification according to NC v2009. We collect rainwater to provide non-potable water to wc. May we consider this water in WEp1 and WEc3 calculation?
Lead Paint
NC-2009 SSc3:Brownfield Redevelopmentposted by Megan Bove on
Hey. I have a quick LEED question.
SSc1 Option 1 and Regional Priority Credit
CI-2009 SSc1:Site Selectionposted by Graciela Kessler on
I just received the Review Report for one of our project. We documented SSc1 option 1 LEED certified Building.
Fixture Usage for Travel Plaza/Rest Stop
NC-2009 WEc3:Water Use Reductionposted by Kristina Abrams on
The documentation for WEp1/WEc3 submitted for this project indicated 5,000 retail customers per day visiting the Travel Plaza, utilizing the plumbing fixture usage rate of 0.2 uses per day as defin