hello everybody,
this is my first post on leeduser and I want to start giving compliments to everybody are sharing so lot of knoweledge;
returning to building, a design team described me this context:
- 10 floor building with 4 of them occupied by tenant and 6 of them free.
the owner wants to:
- renovate the envelope
- install new hvac
- renovate the 6 floor that are not occupied (no tenant fit out)
- add 2 more floors
- do all of this work without moving out the 4 tenants

note that is not possible to use leed EBOM because the 4 tenant that occupy the 4 floors are not interested.

Do you see any conflicts in using leed CS ?

thank you very much and happy easter !