Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Natural landscape to recover on site

NC-2009 WEc1:Water Efficient Landscaping
posted by  Luis Huertas  on 

Our project is going to allow the natural landscape to return to the landscape areas of the project. Can I claim no potable use and achieve the credit using this strategy?

1
Tue Mar 11, 2014, 1:54 pm

Entering Transporation Management Plan on LEED Online

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Rosemary Mascali  on 

My client is pursuing an exemplary point for a Transportation Management Plan for a V2009 NC application.

1
Tue Mar 11, 2014, 5:58 pm

Section 11 or Appendix G?

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Gross  on 

Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.

1
Tue Mar 11, 2014, 6:43 pm

CFL compliance

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Gustavo De las Heras Izquierdo  on 

I am checking a compact florescent lamps compliance (integral ballast, bare bulb), which should be 10,000 rated hours according to the credit table. The CFL cut-sheet I've been provided with state

1
Wed Mar 12, 2014, 12:19 am

LEED Project Boundary for a Transit Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kimberlyn Caoagas  on 

BACKGROUND INFO: - Attempting LEED EB: O&M Certification for a historical train/transit station - The first floor of the station has an opening/threshold (no enclosures) that connects to an u

0

Project Scope and Tenant Scope

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Leandro Silva  on 

Another one I can´t quite get my head around. Our client will be the sole tenant in a small commercial building.

1
Fri Apr 11, 2014, 5:16 pm

Purchasing RECS after the Performance Period

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Summer Gorder  on 

Based on our reviewer clarifications, we are needing to take a different tactic to meet our goal.

0

Controller Efficiency

NC-2009 WEc1:Water Efficient Landscaping
posted by  Scott Fornaciari  on 

How do I calculate controller efficiency. I am using a Rainmaster-i Eagle with central control, on-site weather station, rain sensor, flow sensor and master valve.

0

Vegetated area requirement

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  JOHN BURNETT  on 

Hello, I am working on a project in China. According to local standards, only area with 600mm (approx.

1
Sat Jul 26, 2014, 4:07 pm

Minimum Occupancy

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Gina Dederer  on 

So is the minimum FTE of (1) no longer required, specifically for unmanned, fully-automated warehouses or storage facilities?

1
Thu Apr 24, 2014, 3:18 pm