BACKGROUND INFO:
- Attempting LEED EB: O&M Certification for a historical train/transit station
- The first floor of the station has an opening/threshold (no enclosures) that connects to an underground tunnel that lead to the railway terminals/portals.
- The first floor of the station has a separate MEP system from that of the connecting tunnel
QUESTION:
- Even though the station and tunnel are technically connected, can the LEED Project Boundary exclude the tunnel since it's only purpose is for circulation and the MEP systems are separate?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.