Forum quick links
Some questions on LEED volume program
posted by Grace Ming on
I need some advice on the LEED volume certification program.
Simpson Diversity Index score
ND-v2009 NPDc4:Mixed-income diverse communitiesposted by Scott Preston on
Elliot, After running this calcualtion our score is 0.597318339. Do we round this up to 0.6 as is the case in many other LEED calculations?
HVAC Equipment Installation prior to Roof
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Maggie Pipek on
The contractor would like to install the HVAC equipment although the roof is not on the building yet.
Construction impact zone for infill
ND-v4 GIBc7:Minimized site disturbanceposted by Colin Day on
Hi Eliot, If a project is an infill, has been previously graded and already contains streets, would it meet the requirements of this credit? Also, if no historic trees existed in this (an old hay
Australian equivalent of fuel-efficient vehicles
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Haw on
Our project is based in Australia and is targeting certification under both LEED and the local rating system, Green Star.
Anchor Tenant wants sole access to showers
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by SmithGroup BG+LU FW on
We’ve got a core and shell commercial office building in construction, under 300,000 square feet, using CS-2009.
Mixed species
CS-2009 WEc1:Water Efficient Landscapingposted by Mike D on
Do the different species of plants need to be listed individually on the form or does 'Mixed' suffice? The green roof consists of a mix of trees, shrubs, and flowers. Thanks!
Calculating FTE for projects w/ 24/7 work week & shift overlap
posted by Erin Holdenried on
I have been calculating FTEs for projects with shift work based on the 8 hour day and 40 hour work week.
DCV control
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Can someone help me with exception "b" of mandatory section 6.4.3.9 in 90.1. What is meant by the following: b.
Option 2- Air Testing for amenities
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
We r building a residential tower that has 424 residential units, a swimming pool, a lobby and commercial retail units (CRU).