Forum quick links
ASHRAE/IECC Compliance for AHU's, RTU's and Heat Pumps
NC-2009 EAc3:Enhanced Commissioningposted by Peter Dishno on
Hello Design Review Experts, During a design review for a residential high rise, we noted that several areas of common space did not seem to have the capacity to use an economizer, Demand Control
Use of EA Cr 6 for a CS Project
EBOM-2009 EAc6:Emissions Reduction Reportingposted by emily reese moody on
Hi, I'm wondering if anyone has tried attempting this credit as an ID strategy in a CS project.
Campus projects with different rating system
posted by Lolita Wu on
Hi all, We are working on a master site project with three single buildings in the block. Two office buildings are pursuing LEED CS and one hotel building is pursuing LEED NC.
translucent privacy glazing & EQc8.1 / 8.2
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by John Steingraeber on
We are pursuing LEED CI certification for a client who has requested the application of translucent window film in some spaces for security concerns.
On Site Renewable
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Joseph Snider on
The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period.
water efficiency review
NC-2009 WEc3:Water Use Reductionposted by Shristi Bajracharya on
When we sent the WE credit for review for our project, we sent a water use calculation stating that the potable water usage in the project has been reduced by 43% from a calculated baseline design.
Preferred parking in master site project
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lolita Wu on
We are working on a master site with three buildings in the block. Two office buildings are pursuing LEED CS and a hotel building is pursuing LEED NC.
50% of material purchase & composite panel question
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Karin Wohlert on
Achieve sustainable purchases of 50% of total purchases (by cost) during the performance period.
LEED CI applicability
posted by Esther Izquierdo on
Hi, I am working on a commercial project where the new owner is planning a fit-out renewal. The owner will occupy 90% of the space, with 10% being sub-let.
Views and Interstitial blinds
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sean Hogan on
Hi, I'm working on a project where south, east and west elevations will have twin skin glazing with interstitial blinds.