Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE/IECC Compliance for AHU's, RTU's and Heat Pumps

NC-2009 EAc3:Enhanced Commissioning
posted by  Peter Dishno  on 

Hello Design Review Experts, During a design review for a residential high rise, we noted that several areas of common space did not seem to have the capacity to use an economizer, Demand Control

1
Fri Jun 7, 2013, 2:21 pm

Use of EA Cr 6 for a CS Project

EBOM-2009 EAc6:Emissions Reduction Reporting
posted by  emily reese moody  on 

Hi, I'm wondering if anyone has tried attempting this credit as an ID strategy in a CS project.

1
Thu Nov 7, 2013, 9:20 pm

Campus projects with different rating system

General forums
posted by  Lolita Wu  on 

Hi all, We are working on a master site project with three single buildings in the block. Two office buildings are pursuing LEED CS and one hotel building is pursuing LEED NC.

0

translucent privacy glazing & EQc8.1 / 8.2

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  John Steingraeber  on 

We are pursuing LEED CI certification for a client who has requested the application of translucent window film in some spaces for security concerns.

1
Mon Jun 10, 2013, 12:24 pm

On Site Renewable

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Joseph Snider  on 

The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period.

1
Fri Aug 30, 2013, 3:44 pm

water efficiency review

NC-2009 WEc3:Water Use Reduction
posted by  Shristi Bajracharya  on 

When we sent the WE credit for review for our project, we sent a water use calculation stating that the potable water usage in the project has been reduced by 43% from a calculated baseline design.

1
Mon Jun 10, 2013, 5:35 pm

Preferred parking in master site project

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Lolita Wu  on 

We are working on a master site with three buildings in the block. Two office buildings are pursuing LEED CS and a hotel building is pursuing LEED NC.

1
Sun Nov 3, 2013, 2:19 am

50% of material purchase & composite panel question

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Karin Wohlert  on 

Achieve sustainable purchases of 50% of total purchases (by cost) during the performance period.

1
Wed Jul 31, 2013, 4:05 pm

LEED CI applicability

LEED Rating System Selection
posted by  Esther Izquierdo  on 

Hi, I am working on a commercial project where the new owner is planning a fit-out renewal. The owner will occupy 90% of the space, with 10% being sub-let.

1
Tue Jun 18, 2013, 12:40 pm

Views and Interstitial blinds

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Sean Hogan  on 

Hi, I'm working on a project where south, east and west elevations will have twin skin glazing with interstitial blinds.

1
Tue Jun 11, 2013, 3:33 pm