Connection of sidewalks
Pilot-Credits PC14:Walkable Streetsposted by Karyn Rodrigues on
For this credit, one of the requirements is "Continuous sidewalks [...] serve all buildings [...] and connect them with public sidewalks.".
Manual Equipment
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Timothy Casper on
Can manual equipment (ex: a carpet sweeper) that is used in place of powered equipment (ex: a vacuum) be counted when trying to achieve the 20% threshold for compliant inventory equipment?
One built-out floor in a CS
NC-2009 PIf3:Occupant and Usage Dataposted by Jason Biondi on
I am working on a three story office building, that is registered as LEED Core & Shell, where the 2nd floor will be built-out for the owner's company, which means we know the occupancy of the 2
Review
NC-2009 WEc3:Water Use Reductionposted by Alicia Villanueva on
My project has achieved a 82% savings in flow & flush fixtures through recycling 100% of the waste water and reusing it for WC and urinal flushing. We documented this with a spreadsheet. Howe
Option 1
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
Under Option 1 what does the following actually mean? If the total weight is more than five percent of the product by weight, furniture components must be included.
Medical Equipment
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
How does medical equipment factor into this credit?
Naturally or mechanically conditioned?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Alicia Villanueva on
Our project is a car showroom in a location where no air conditioning nor heating is needed due to the mild clima throughout the year. This is an occupied, enclosed space.
FTE for a Kinder-6thGrade school in LEED New Construction v2.2
posted by cristina algaze beato on
LEED NC v2.2 is not as specific as LEED for Schools v3 for the FTE in schools. It seems that for different credits, different FTEs may be reasonable in this building type.
SSc4.3 and SSc4.4
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Sheryl Swartzle on
There is no new parking provided within the LEED boundary of our project (no parking at all). The project is part of a performing arts center campus.
Minimize Sediment Track Out question...
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Rick Alfandre on
We have a construction site with an existing 40 ft asphalt driveway & entry/exit, which we will be using as our only construction entry point.