We have a construction site with an existing 40 ft asphalt driveway & entry/exit, which we will be using as our only construction entry point. Would an existing asphalt driveway qualify as legitimate sediment tracking solution, or will we need to provide crushed gravel/filter fabric or tracking mats?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Michael DeVuono
Regional Stormwater LeaderArcadis North America
LEEDuser Expert
187 thumbs up
June 4, 2013 - 4:56 pm
I've never seen this approach fly, unless you can make the argument that there will never be contact with disturbed soil.