Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Airflow Monitoring Devices Specifications

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ahmed Younis  on 

Does the (airflow sensor) need to have any specifications other than the required accuracy (which is 15%) which was mentioned in the study guide?

1
Mon May 27, 2013, 4:25 pm

water use reduction calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  Jamal Uddin  on 

How to calculate the baseline building performance with compare to my building performance in water use reduction?

1
Mon Aug 19, 2013, 6:29 pm

LEED Project Boundary of vertical attached building

NC-2009 PIf2:Project Summary Details
posted by  Nan ZHANG  on 

Dear all, I'm working on a vertical attached building project.

1
Fri May 31, 2013, 8:44 pm

Denied Design Credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Karim Farid  on 

If a Design credit was denied in the Final Design review, can I resubmit it with the Construction credit after addind the missing information

1
Mon May 27, 2013, 7:00 pm

Tenant Submetering

CI-2009 EAc3:Measurement and Verification
posted by  sompoche sirichote  on 

I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora

1
Tue May 28, 2013, 2:34 pm

Cooling EIR as the only evidence of PFan modeled separately?

NC-2009 EAp2:Minimum Energy Performance
posted by  Ting Wang  on 

We received an comment review about a system 6 (PVAV w/ PFP boxes) baseline model in eQuest: The SV-A reports indicates that the cooling efficiencies for the HVAC systems were not correctly reflect

1
Tue Jun 4, 2013, 2:06 pm

Direct grid feed in - eligible?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jens Apel  on 

After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic

1
Tue May 28, 2013, 2:46 pm

Credit language

Pilot-Credits PC14:Walkable Streets
posted by  Michael Beattie  on 

HI all, The language of this pilot credit and this discussion raises questions that I'd love to get clarification on: Is the required distance between street trees 45 feet (15 meters) or 450 feet

1
Mon Dec 21, 2015, 7:52 pm

Pilot credit

ND-v2009 IDc1:Innovation and exemplary performance
posted by  Noriko Nagazumi  on 

Hi, We are seeking oppotunity to achieve a point via pilot credit. We can find only one pilot credit applicable to ND in the pilot credit library in USGBC web site.

1
Thu May 30, 2013, 2:51 pm

4.3 effic vehicle parking versus 4.4 car pool parking

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Noriko Nagazumi  on 

Hi, In a project where preferred parking are the parking spaces closest to the main entrance, is there any order when SSc4.3 placing low emitting and fuel efficient vehicles preferred parking and

1
Tue Jul 9, 2013, 5:04 pm