Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Refrigerant Gas AB-22- Compliance

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Marina Andrade  on 

Hi, Does anyone knows if the Refrigerant Gas AB-22-A comply with the CFC´s - EBOM requirements? Is there any Leed adenda in order to confirm this? Thanks in advance.

1
Fri Mar 22, 2013, 5:42 pm

What's the surprise new MR option in LEED v4 all about?

General forums
posted by  Tristan Roberts  on 

I posted an article in its own LEEDuser forum going into more depth on what MRc4 Option 3 is all about.

0

Exterior window shades controllability

Healthcare-v2009 IEQc6.1:Controllability of systems - lighting
posted by  April Eisenhauer  on 

To meet this requirement: "In private rooms, provide occupant controls that are readily accessible from the patient bed for exterior window shades, blinds, and/or curtains" Does this mean for all

1
Wed May 22, 2013, 8:47 pm

Three Different Kitchen Sinks

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Eric Webber  on 

If our project has three different kitchen sinks with varying flow rates (ie SK-1: 1.0GPM, SK-2: 1.5GPM etc), how do I enter the usage for the FTE in the project?

1
Tue Mar 19, 2013, 10:56 pm

Strategy/ Methodology to divert concrete waste from Landfill

NC-2009 MRc2:Construction Waste Management
posted by  Mohd Imran Shaikh  on 

We are currently aiming to achieve this credit on a project by providing on site infrastructure to separate waste and divert from landfill.

1
Wed Mar 20, 2013, 1:04 pm

Lease Agreement an option to comply with the credit requirements

NC-2009 PIf4:Schedule and Overview Documents
posted by  Katherine Ann Resurreccion  on 

Hi, We are currently documenting the requirements for PIf4 and our option in order to comply is to provide a Tenant/Lease Agreement for certain credits.

1
Mon Jul 1, 2013, 8:07 am

Other tenant space is unoccupied...

CI-2009 SSc1:Site Selection
posted by  Kerrie Racicot  on 

Our project space occupies a majority of the building, however the only other tenant space is unoccupied. Is Path 7 - Light Pollution Reduction possible?

1
Thu Mar 21, 2013, 8:27 pm

"Peak occupants" and "Full-time equivalent (FTE) occupants"

NC-2009 PIf3:Occupant and Usage Data
posted by  Marcio Alberto Casado Pereira  on 

We have a multiple building situation. The changing rooms of one of the buldings (named "P10") serves to the population of the entire campus.

1
Thu Mar 21, 2013, 8:24 pm

Hvac - Baseline System Descriptions

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl

1
Wed Mar 20, 2013, 6:41 pm

USGBC as Code Officials

General forums
posted by  Hernando Miranda  on 

The USGBC has been a code and rules enforcement organization for some time now.

0