Commissioning of plumbing fixtures when no hot water

NC-2009 EAc3:Enhanced Commissioning
posted by  Emmanuel Pauwels  on 

The review comments of the basic Commissioning of our project says the following " it appears that all systems included within the LEED-NC project scope of work have not been included.

1
Fri Aug 17, 2012, 1:40 pm

MR Calculator incorrect?

CS-2009 MRc5:Regional Materials
posted by  Reid Middlebrooks  on 

It appears that the BDC Material and Resource Calculator (July 2012) provided under the credit resources incorrectly calculates the Regional Material percentage.

0

Using Lease Agreement for Undesigned Elements

CS-2009 EAp2:Minimum Energy Performance
posted by  Tony Schafer  on 

I am wondering if the tenant lease agreement can be used to specify undesigned elements for EAp2 similar to how it is used to achieve other credits.

1
Fri Aug 17, 2012, 7:18 pm

Mandatory Provisions

NC-2009 EAp2:Minimum Energy Performance
posted by  Diego Escalona  on 

Hello All, I have two questions about compliance with the mandatory provision: 1) Only the main air conditioning system should be evaluated with the tables in chapter 6?

1
Fri Aug 17, 2012, 8:25 pm

Minimum Density Calculation

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Carmelito Tatlonghari  on 

In the Sustainable Sites CREDIT 2/ OPTION 1 – Development Density - I don’t understand why “the density calculation is based on a typical two-storey downtown development…” Why not on a 1-storey or

1
Mon Aug 20, 2012, 3:32 pm

entryway systems for trucks

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Florian Schmidtchen  on 

In a manufacturing facility we have trucks and fork lift trucks entering the buildings.

1
Fri Aug 24, 2012, 7:53 pm

What happens when you 'skip final design review'?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Valerie Molinski  on 

I've never been in this situation before, and I don't want to hit the button and 'wait and see.' i have a project where we were doing a split submittal.

1
Tue Aug 21, 2012, 2:30 pm

Sample Commisioned Projects Criteria

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jalal Avades  on 

What are the requirements/criteria to meet the 'Representative Projects'?

1
Tue Aug 21, 2012, 12:36 pm

New to AGMBC

LEED Guidance for Campuses and Multiple Buildings
posted by  Anthea Ng  on 

Hi everyone, here is a new comer of LEEDuser. Umm... after reading the LEED online block set up instruction, grateful if I could have more rigid advices.

1
Tue Aug 21, 2012, 3:55 pm