Forum quick links
Public fixtures and private fixtures
Healthcare-v4 WEp2:Indoor water use reductionposted by Steve Cearnal on
Does it make sense to break out into two groups? one for public toilets/ lavatories and second group for private toilets and lavatories?
Polyvalent Chiller Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Francisca Herrera on
Hi, I hope you can help me with my query.
In a project in process of certification LEED v2009, we are evaluating the efficiency of a polyvalent chiller.
Hz for mandatory provisions for fans
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to verify whether a fan is compliant with the mandatory provisions we have to consider Table 10.8B, haven't we?
"Project details" page
posted by Felicia Ridgeway on
The "Project Details" page on LEED Online (under the "Details" tab) for my project lists an "ANTICIPATED END DATE" of May 15, 2020.
LEED v4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning - implementationposted by Aber Alvi on
A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the
Species not able to receive reclaimed water
NC-2009 WEc1:Water Efficient Landscapingposted by Brightworks Sustainability on
We are building on a previously developed site where there are many existing Redwood trees that will not be uprooted for the project.
EAp2-c1 ACP
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
While performing EAp2 for a C&S registered project, could we apply the ACP spreadsheet calculator as we did in CS 2009.
Thanks.
Regularly Occupied Area - Kitchen Countertops and Islands
NC-2009 PIf3:Occupant and Usage Dataposted by Rose Winter on
I know that residential kitchens are considered regularly occupied.
Facade lighting - off after 10pm
NC-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
Hello, Would that be possible to reach the credit, if the facade lighting doesn't fullfil the upligth criteria, but it is turned off after 10pm?