Are accessible entrances considered regularly used
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Risto Beatty on
Sound transmission - STC vs Rw
NC-v4 EQc9:Acoustic performanceposted by Indochine Engineering VN on
Hi, It is told that Rw is very similar to STC, I would like to ask for Sound transmission, Does LEED recognize the use of Rw (Weighted Sound Reduction index) and ISO 140 (acoustic) standard instead
Flush Out for "During Occupancy" Case of a Major Renovation proj
NC-v4 EQc4:Indoor air quality assessmentposted by Shabari Shaily Gerber on
Our project is an office building undergoing major renovation. The building will remain operational while the renovation is ongoing.
Losses through tank in HW loop
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
ASHRAE 90.1 states:
G3.1.3.6 Piping Losses losses shall not be modeled in either the proposed or baseline
building designs for hot water, chilled water, or steam piping.
Pneumatic Controls - Monitoring Based Cx
CI-v4 EAc1:Enhanced commissioningposted by Christopher Lim on
I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.
About Spray adhesives, Material has voc g/l limit and Greenguard certificate.
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project is located in South Korea, so I open fall into difficulties to interpret manufacture data.
Spray adhesives has VOC Contents and GREENGURAD certificate also. This material can be use?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project located in South Korea. So I often fall into difficulties to interpretation manufacture data.
The material is "Scotch-WeldTM Hi-Strength Postforming 94 CA".
Timing outsourced solar plan on-site / the building
NC-2009 EAc2:On-Site Renewable Energyposted by Janine van den Kerkhof on
Hi All,
one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.