Forum quick links
Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lance Barron on
Is building envelope commissioning required for CI if the exterior walls and roof are not being touched? Thanks.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,
Book stack areas as non-regularly occupied?
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
Hi all,
Fans cycling during unoccupied hours
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Method to report proposed case Energy consumption - On site Gas Engine based electricity generation
NC-2009 EAp2:Minimum Energy Performanceposted by Rahula Attalage on
Dear All,
I have received the following comment by the reviewer:
Dual Flush Flow Rate
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.
Hoarding dimensions
NC-v4 SSp1:Construction activity pollution preventionposted by Ahmed Labeeb on
Dear All,
Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?
rating system selection
posted by Sandro Paglia on
Good afternoon, we're certifying a building that is 10% retail, 10% offices and 80% residential.