Metered Faucets w/less than 12 Sec Duration
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Rosenberger on
I have received my second metered lav faucet submittal with less than 12 sec from factory duration.
Split certification doubts
posted by Marina Curto on
Good morning,
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.
Pumps: Balancing Report HPs vs Design
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there
Data Commons & Pharos
posted by Tom Lent on
For those of you researching chemical hazards: The Chemical Hazard Data Commons referenced in the Pharos description above is now out of beta and
Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?
Existing Building HVAC being upgraded and will serve new addition - LPB?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sue Bryant on
WE have a project that is an addition to an existing building. The addition is served by the HVAC from the existing building.
Uploading of Construction Credits
posted by Stephen Sgro on
We are currently under preliminary design review on a LEED 2009 Schools (split review) project. We received LEED prelim.